A detached ADU in Compton.
A new backyard unit built from bare ground: footings, a new sewer line, the slab, and a finished kitchen and tiled shower.

A second home, built from the ground up.
The homeowners in Compton wanted a separate, fully livable unit in the backyard. We took the project from layout and foundation through utilities and interior finishes, under one contract.
Below are the main stages of the build, photographed on site by our crew.
- Footings and forms
- New sewer line under the foundation
- Slab with anchor bolts and plumbing stubs
- Full kitchen and tiled shower
How it was built.

Footings formed.
We laid out the unit and set the footing forms to the approved plans. The footings carry the whole building, so this is where accuracy matters most.

A new sewer line.
Before any concrete, we ran a new sewer line under the footing so the ADU drains on its own connection. Doing it now avoids cutting the slab later.

Slab poured.
The slab went in with anchor bolts and the plumbing stubs already in place, ready for framing and inspection.

A full kitchen.
Inside, the unit got a complete kitchen with shaker cabinets, counters and vinyl plank flooring that holds up to everyday use.

A tiled shower.
The bathroom finished with a marble-look tile shower. With the kitchen and bath done, the unit is a complete, livable home.
Related services.
One contractor for the whole job means one schedule, one contract and no finger-pointing between trades.
Planning an ADU?
Let’s look at your lot.
(213) 573-0333 Sun–Thu 9 AM–9 PM · Fri 9 AM–2 PM · [email protected]